Instagram is now live! Follow us on @tsirc.council
The Zenadth Kes Planning Scheme
Sustainable development in the Torres Strait Islands.
Zenadth Kes Planning Scheme
The Zenadth Kes Planning Scheme is a comprehensive framework designed to guide sustainable development in the Torres Strait Island Regional Council area.
The region’s first planning scheme was originally implemented on July 11 2016, the scheme reflects state, regional, and local policies while considering the unique cultural and environmental context of the region. The new Zenadth Kes Planning Scheme was implemented 23 February 2018.
Community Vision:
Honouring Ailan Kastom (Island Custom) and preserving cultural heritage is central to development. We focus on empowering Torres Strait communities in decision-making for a sustainable future.
Key Components
Strategic framework
Addresses key themes:
- Environment and Natural Resources: Protecting biodiversity and cultural links to land and sea.
- Natural Hazards: Mitigating risks from climate change, coastal erosion, and other hazards.
- Economic Development: Encouraging local industries and employment while preserving environmental values.
- Infrastructure: Enhancing water, waste, electricity, and telecommunications services to improve community wellbeing.
Development guidance
Categories of development include accepted, assessable (code and impact assessments), and prohibited activities. A hierarchy ensures consistency between local and state regulations.
Infrastructure planning for each island, considering growth, demand, and priorities for water, sewerage, transport, parks, and community facilities.- Local Government Infrastructure Plan (LGIP): Infrastructure planning for each island, considering growth, demand, and priorities for water, sewerage, transport, parks, and community facilities.
- Cultural Integration: Development integrates Ailan Kastom and requires consultation with local Prescribed Body Corporates (PBCs) to ensure cultural and heritage considerations.
- Sustainability Focus: Encourages renewable energy, sustainable waste management, and environmentally friendly designs.
Special considerations:
- Native Title Obligations: Development must comply with the Native Title Act 1993, including obtaining consent for projects affecting native title land.
- Community Engagement: Policies promote collaboration with Traditional Owners and community members to incorporate local knowledge.
This planning scheme establishes a balance between cultural preservation, environmental protection, and development, ensuring a resilient and sustainable future for the Torres Strait Islands.
Zenadth Kes Planning Scheme
Download Part 7 - Preliminary (PDF - 35 KB)
Download Part 7 - Badu Island Plan (PDF - 4 MB)
Download Part 7 - Boigu Island Plan (PDF - 4 MB)
Download Part 7 - Dauan Island Plan (PDF - 3 MB)
Download Part 7 - Erub (Darnley) Island Plan (PDF - 4 MB)
Download Part 7 - Iama (Yam) Island Plan (PDF - 4 MB)
Download Part 7 - Kirriri (Hammon) Island Plan (PDF - 4 MB)
Download Part 7 - Kubin (on Moa Island) Plan (PDF - 4 MB)
Download Part 7 - Mabuyag Island Plan (PDF - 4 MB)
Download Part 7 - Masig (Yorke) Island Plan (PDF - 4 MB)
Download Part 7 - Mer (Murray) Island Plan (PDF - 3 MB)
Download Part 7 - Poruma (Coconut) Island Plan (PDF - 3 MB)
Download Part 7 - Saibai Island Plan (PDF - 4 MB)
Download Part 7 - St Pauls (on Moa Island) Plan (PDF - 4 MB)
Download Part 7 - Ugar (Stephens) Island Plan (PDF - 4 MB)
Download Part 7 - Warraber-Dhuwal Pad (Sue) Island Plan (PDF - 4 MB)
Download Part 8 - Development codes (PDF - 103 KB)
Download Part 8 - Schedule 1 - Definitions (PDF - 156 KB) (PDF - 156 KB)
Download Part 8 - Schedule 2 - Map Index (PDF - 51 KB) (PDF - 51 KB) (PDF - 51 KB)
Download Part 8 - Schedule 2 - Badu Island Maps (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Part 8 - Schedule 2 - Dauan Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Erub (Darnley) Island Map (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Part 8 - Schedule 2 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 2 - Kirriri (Hammond) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Kubin (on Moa Island) Map (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Mabuyag Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Masig (Yorke) Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Mer (Murray) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 2 - Poruma (Coconut) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Saibai Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - St Pauls (on Moa Island) Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Ugar (Stephens) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Map Index (PDF - 20 KB) (PDF - 20 KB) (PDF - 20 KB)
Download Part 8 - Schedule 3 - Badu Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Boigu Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Dauan Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Erub (Darnley) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Kirriri (Hammond) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Kubin (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Mabuyag Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Masig (Yorke) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Mer (Murray) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Poruma (Coconut) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Saibai Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - St Pauls (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Ugar (Stephens) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 5 - Planning Scheme Policies (PDF - 72 KB) (PDF - 72 KB) (PDF - 72 KB)
Download Schedule 1 - Definitions (PDF - 156 KB) (PDF - 156 KB)
Download Part 8 - Schedule 2 - Map Index (PDF - 51 KB) (PDF - 51 KB) (PDF - 51 KB)
Download Part 8 - Schedule 2 - Badu Island Maps (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Part 8 - Schedule 2 - Dauan Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Erub (Darnley) Island Map (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Part 8 - Schedule 2 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 2 - Kirriri (Hammond) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Kubin (on Moa Island) Map (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Mabuyag Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Masig (Yorke) Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Mer (Murray) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 2 - Poruma (Coconut) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - Saibai Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Part 8 - Schedule 2 - St Pauls (on Moa Island) Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Part 8 - Schedule 2 - Ugar (Stephens) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Map Index (PDF - 20 KB) (PDF - 20 KB) (PDF - 20 KB)
Download Part 8 - Schedule 3 - Badu Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Boigu Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Dauan Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Erub (Darnley) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Kirriri (Hammond) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Kubin (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Mabuyag Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Masig (Yorke) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Mer (Murray) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Poruma (Coconut) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 3 - Saibai Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - St Pauls (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Part 8 - Schedule 3 - Ugar (Stephens) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Part 8 - Schedule 5 - Planning Scheme Policies (PDF - 72 KB) (PDF - 72 KB) (PDF - 72 KB)
Download Schedule 2 - Map Index (PDF - 51 KB) (PDF - 51 KB) (PDF - 51 KB)
Download Schedule 2 - Badu Island Maps (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Schedule 2 - Dauan Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Schedule 2 - Erub (Darnley) Island Map (PDF - 5 MB) (PDF - 5 MB) (PDF - 5 MB)
Download Schedule 2 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 2 - Kirriri (Hammond) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Schedule 2 - Kubin (on Moa Island) Map (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Schedule 2 - Mabuyag Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Schedule 2 - Masig (Yorke) Island Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Schedule 2 - Mer (Murray) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 2 - Poruma (Coconut) Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Schedule 2 - Saibai Island Maps (PDF - 3 MB) (PDF - 3 MB) (PDF - 3 MB)
Download Schedule 2 - St Pauls (on Moa Island) Maps (PDF - 4 MB) (PDF - 4 MB) (PDF - 4 MB)
Download Schedule 2 - Ugar (Stephens) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 2 - Warraber-Dhuwal Pad (Sue) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Map Index (PDF - 20 KB) (PDF - 20 KB) (PDF - 20 KB)
Download Schedule 3 - Badu Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Boigu Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Dauan Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Erub (Darnley) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Iama (Yam) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Kirriri (Hammond) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Kubin (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Mabuyag Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Masig (Yorke) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Mer (Murray) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Poruma (Coconut) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Saibai Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - St Pauls (on Moa Island) Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
Download Schedule 3 - Ugar (Stephens) Island Maps (PDF - 1 MB) (PDF - 1 MB) (PDF - 1 MB)
Download Schedule 3 - Warraber-Dhuwal Pad (Sue) Island Maps (PDF - 2 MB) (PDF - 2 MB) (PDF - 2 MB)
The Zenadth Kes Planning Scheme (Full Document)
Frequently Asked Questions
The Zenadth Kes Planning Scheme serves as a comprehensive framework to guide sustainable development across the TSIRC area. It balances cultural preservation, environmental protection, and development to ensure the long-term resilience and prosperity of the region.
The planning scheme integrates Ailan Kastom by requiring consultation with local prescribed body corporates (pbcs) to ensure development aligns with cultural and heritage values. It also encourages community involvement in decision-making to honour and preserve cultural traditions.
The planning scheme categorises development into accepted, assessable (code and impact assessments), and prohibited activities. Each development is assessed to ensure compliance with cultural, environmental, and infrastructure requirements while meeting local and state regulations.
Contact Us
For more information on the Zenadth Kes Planning Scheme and development applications please contact us:
Phone: 07 4034 5700
Email: info@tsirc.qld.gov.au
Postal Address: PO Box 7336 Cairns QLD 4870